It has been awhile since I have updated everyone on this project. Alot of little things are now starting to come to fruition.
I have done the following:
Seam sealed the entire top side of the floor - from trunk to firewall.
Painted the entire floor as well.
Installed a new Master cylinder, though if I need to will replace it, though it is a dual diaphram 7 in power system.
Welded into place the 5 gallon air tank
Put in a mock-49 dash to help set the dash pieces in place and wired
Set up the wiring harness placement, though I haven't yet started to wire it
Fabricated the fuel filler tube and surround
Installed a holley carb to get it running, but will eventually replace it with an edelbrock
Removed the entire windshield glass and rubber moulding, and door panels
So..now it can stop, shift, turn, and move up and down
Still so much to do, but one step at a time.
Sunday, October 24, 2010
Subscribe to:
Posts (Atom)